Repair 55 RQS HVAC Fire Suppression Support at Davis-Monthan AFB, AZ


Nicklaus was responsible for the design analysis, design calculations, drawings, construction cost opinion, specifications, construction schedule, and project progress and meeting minutes in accordance with applicable Air Force, local, state and federal codes and requirements. Nicklaus additionally provided design services to include planning reports/studies, site investigation, design charette, conceptual design documents through the final design documents, and project closeout.

Project Type: Federal

Client: Davis Monthan AFB

Role: Civil Engineering, Architecture, Environmental Engineering and Consulting, Geotechnical Engineering, Construction Management, and Facilities Management.

Service(s):

  • Civil Engineering
  • Architecture
  • Environmental Engineering and Consulting
  • Construction management
  • Geotechnical Engineering

Funding: $398,687

Location: Davis Monthan AFB, Tucson, AZ